Summer & Winter Test facility- (Jaisalmer & Manali)

Weather testing is integral to automotive safety, durability, and efficiency. Extreme weathers can impact component strength/performance, road grip, visibility, fuel efficiency, and more. Weather testing ensures that the vehicles can withstand the harsh weather conditions and helps detect shortcomings early on.
ATS offers both Summer and Winter testing facilities, at Jaisalmer and Manali respectively. Our testing services comprise vehicle handling including road tests in harsh environments, deriving durability test routes, customer support, loading and boarding facilities, workshops with standard service tools, permissions from local authorities for conducting trails, and other support systems.

VEHICLE HANDLING

  • Provide support to the industry to conduct on road test in harsh environment to verify the performance of vehicle, system or components
  • Support in deriving the Durability test route for test vehicle as per category
  • Organize Drivers / Riders / Technicians to support the customer during the test period as required.
  • Provide workshop along with the facilities for fixing the vehicle issues

Loading and Boarding Facilities

Hotel Golden Flower Jaisalmer




Work Shop & Parking facility



Offerings

  • Workshop with standard service tools
  • Three phase supply to for EV Chargers
  • AC / DC charger on need basis
  • Trained Driver, Riders & Technician to conduct the tests
  • Gen set on need basis
  • Provide Break down pickup
  • Storage space for essential spares
  • Worktable for the visiting engineers with Wi-Fi facility
  • Loading And Boarding Facilities
  • Durability route
  • Highway touch with charging and Parking facilities
  • Seeking Permission for conducting trails with the local authority


Route Map : City and Highway


Our Deliverables :

  • Daily Check List Of Vehicles
  • Daily Running log of test Vehicles
  • Observations during charging discharging
  • Data Collection & measurement (if required)
  • Working in shift as required by the project
  • Arrange AC / DC charger (optional)